Afghanistan ROM Portfolio

Minerals from source to market.

A consolidated view of King Mining’s run-of-mine material portfolio, supported by mine-side coordination, assay review, cargo planning, and regional delivery discussions.

ROM Projects

One portfolio. Multiple commercial pathways.

Each card opens a dedicated project page containing available laboratory evidence, mine-side media, technical context, and a route to commercial enquiry.

Zn Assay documented
PROJECT 01

Zinc

Four analytical records document distinct zinc-bearing materials, with sample-specific zinc results reported up to 52.5% Zn.

4 Analytical Records Up to 52.5% Zn Lot Confirmation
View Zinc Project
Pb Assay documented
PROJECT 02

Lead

Four laboratory reports document high-grade lead-bearing samples, including elemental lead results reported up to 84.55% Pb.

4 Laboratory Reports Up to 84.55% Pb Sample-Specific
View Lead Project
Zn|Pb Assay documented
PROJECT 03

Zinc–Lead

Three laboratory-tested polymetallic samples include zinc-dominant, lead-dominant, and balanced profiles for buyer-led evaluation.

3 Tested Samples Up to 66.55% Zn + Pb Dual-Metal Review
View Zinc–Lead Project
Cu XRF documented
PROJECT 04

Copper

An XRF-screened copper-bearing sample reports approximately 12.93% Cu, with an initial multielement profile for buyer qualification.

XRF Screening Approx. 12.93% Cu Buyer Qualification
View Copper Project
Sb Assay documented
PROJECT 05

Antimony

Independent laboratory records document high-grade Afghan stibnite lump samples with reported antimony grades of approximately 58–69% Sb.

Stibnite Lumps Approx. 58–69% Sb Independent Assays
View Antimony Project
Cr Assay documented
PROJECT 06

Chromite

Two SGS assays report 45.87% and 48.27% Cr₂O₃, supported by independent mineral-characterisation evidence for technical review.

3 Analytical Records Up to 48.27% Cr₂O₃ Ferrochrome Review
View Chromite Project
Coal Lab documented
PROJECT 07

Thermal Coal

Six tested profiles report GCV results from 6,905 to 7,839, alongside sample-specific ash, sulphur, moisture, and combustion characteristics.

6 Tested Profiles GCV 6,905–7,839 Plant Qualification
View Coal Project
Commercial Pathway

From mineral selection to cargo planning.

The portfolio page should guide a serious buyer toward the correct project, establish the minimum information required, and then move the discussion into a controlled LOI and technical-review process.

Select the mineral

Buyer identifies the ROM material relevant to its plant or trading mandate.

Review evidence

Available assays, mine-side media, material form, and lot information are reviewed.

Define commercial requirements

Quantity, destination, delivery point, payment framework, and inspection method are clarified.

Submit an LOI

A qualified enquiry proceeds to source confirmation, cargo planning, and contract discussion.

Qualified Enquiries

Start with the mineral, volume, and destination.

Share your target material, estimated monthly requirement, delivery destination, and preferred commercial terms so the appropriate project can be reviewed.